HHM demand-led research
How to compare bathroom remodel quotes and waterproofing
A bathroom bid should explain how the finished room will manage water, moisture, ventilation, movement, and daily use—not merely name attractive tile and fixtures. Compare contractors using the same plan and selections, then trace the proposed system from demolition and substrate repair through plumbing, waterproofing, drainage, tile, ventilation, electrical work, fixtures, finishes, permits, testing, and cleanup. Waterproofing is concealed after installation, so its materials, transitions, penetrations, flood or leak testing, compatible components, and warranty responsibility should be settled in writing before the walls and floor are covered.
What matters first
- Give every bidder the same measured plan, elevations, fixture schedule, tile areas and layouts, accessibility needs, storage, lighting, ventilation goals, finish selections, and assumptions about walls, floor framing, plumbing locations, adjoining rooms, and owner-supplied products.
- Define the wet-area assembly as a system. Identify the shower base or receptor, drain and connection, slopes, curb or curbless transition, wall and floor substrate, waterproofing membrane, seams, corners, changes of plane, niches, benches, fastener treatment, pipe penetrations, height and coverage limits, and compatible setting materials.
- Clarify how concealed conditions are handled. Demolition can reveal rot, mold-like growth, damaged framing, inadequate subfloor, old plumbing, unsafe wiring, or prior leaks. The contract should describe documentation, unit prices or investigation costs, written approval, schedule effects, and who designs or performs corrective work.
- Tile pricing should state product, size, finish, quantity, waste, pattern, orientation, layout reference lines, edge profiles, trim pieces, movement and perimeter joints, grout type and color, sealant, substrate preparation, setting material, protection, cleaning, and responsibility for shade variation or breakage.
- Plumbing scope should identify exact fixtures and valves, supply and drain changes, shutoffs, pressure or flow concerns, shower controls, anti-scald protection where required, tub filling and drainage, toilet rough-in, leak testing, and access for future service. Product compatibility matters as much as finish.
- Ventilation should be sized and routed for the actual room and duct path. Compare fan airflow, sound, controls, duct diameter and material, exterior termination, backdraft protection, insulation where needed, makeup-air path, and how installed airflow will be confirmed rather than relying only on the box rating.
- Accessibility choices work best when planned into structure and layout. Discuss clear floor space, doorway and approach, shower entry, controls, seating, handheld shower, slip resistance, toilet and vanity use, and blocking for present or future grab bars before walls are closed.
- Separate selected products from allowances, labor, permits, design, delivery, disposal, taxes, optional work and financing. For each allowance, state quantity, tax, freight, waste, contractor markup, installation, return terms, selection deadline, and how overages or credits are calculated.
Verify before spending
- 1Resolve the layout, fixture locations, wet-area boundaries, tile extents, ventilation route, major product sizes, and accessibility goals before final bidding. Mark every alternate, allowance, exclusion, owner-supplied item, and unresolved condition.
- 2Verify required contractor and plumbing or electrical licenses with the state or local authority, confirm insurance, identify subcontractors, determine who obtains permits, and speak with recent customers whose projects used the same waterproofing and tile system.
- 3Compare proposals line by line: protection, demolition, framing, subfloor, plumbing, electrical, ventilation, insulation, drywall, wet-area substrate, waterproofing, testing, tile, fixtures, cabinetry, counters, glass, painting, accessories, permits, cleanup, schedule, payments, exclusions, and warranties.
- 4Ask for the waterproofing manufacturer and written installation method, then verify that the drain, membrane, sealants, fasteners, boards, corners and accessories are approved together. Define required inspections and any flood or leak test before tile conceals the work.
- 5For a pre-1978 home, determine whether painted surfaces will be disturbed and verify applicable EPA or authorized-state lead-safe renovation requirements before demolition. Keep the required notices and project records.
- 6Check the exact toilet, faucet and showerhead models in EPA’s WaterSense product resources when water efficiency and performance are purchase goals. Compare fan airflow, sound and efficiency information, and check fixtures, fans and other products against current recall notices.
- 7Before final payment, inspect slopes and drainage, operate every valve and fixture, check for leaks, confirm hot-water control, test outlets, lighting and ventilation, inspect tile and sealant, obtain permit closeout, collect photographs of concealed work, manuals, warranties, registrations, lien releases where appropriate, and written completion of remaining items.